Bihar Factory License

In Bihar, manufacturing plant registration is necessary as per the provisions of the manufacturing plant Act, 1948. Manufacturing plant house owners should register their premises with the district governing authority before the commencement of business. Before issuance a manufacturing plant license, the approval of the building set up is required for the manufacturing plant. The Chief Inspector of Labour Commissioner Organisation can grant the manufacturing plant license when registration.

Applicability of the Act

1.      The below-mentioned factories area unit presupposed to request for manufacturing plant license below the subsequent conditions.

2.      The manufacturing plant or institution holds 10 or a lot of staff used with the utilization of power for producing activities.

3.      The manufacturing plant or institution carries twenty or a lot of staff used while not the utilization of electricity for producing activities.

Authority of sanctioning

S NO

NO OF WORKERS

AUTHORITY

1

Factories were employing less than 300 workers.              

Assistant Director of Factories and Boilers.

2

Factories were employing less than 300 or more workers.             

Director of Factories and Boilers.

 

3

Major Accident Hazard Factories              

Chief Inspector of Factory

 

Validity of License

1.      The validity of allow approval is for one year. If the development isn't completed inside one year, then the applier should apply for revalidating the allow to a similar sanctionative authority.

Documents needed for Building arrange Approval

The required documents are to be created for the approval of your building arrange.

1.      In case of modification of Directors-Form thirty two of the businesses Act

2.      A brief description of the producing method and Flow method chart

3.      Land papers of the works

4.      Proof of Partnership Deed

5.      NOC from State Pollution electrical device

6.      NOC from Forest department

7.      Permission from the Mining department

8.      List of Plant and Machinery

9.      List of Raw Materials

10.   Map of { building as well as web site plan, arrange elevation and every one constant crosswise.

Documents needed for works License

1.      The excepted documents are to be submitted at the side of the appliance kind of works licensing.

2.      Land papers of the works

3.      NOC / Licence of the involved department (for Saw-mill Explosives arms and ammunition)

4.      Company note of Association and article

5.      List of gift administrators if there's a modification in director kind 12/32 of the businesses Act

6.      List of Board of administrators and Relevant paper relating to their appointment

7.      Proof of Partnership Deed

8.      List of Plant and Machinery

9.      List of Raw Materials

10.   Letter of appointment of occupier from the involved ministry (If the govt. owned)

11.   Certificate relating to the appointment of the occupier

12.   In case of LLP / venture ratite bird relevant paper

13.   Project Report

14.   NOC from State Pollution electrical device